Manufacturing project dashboard displayed on a screen

Manufacturing Project Management from RFQ to Delivery

From RFQ to shipment, STARWAY coordinates engineering, production, and quality. We clarify what needs your approval, share progress updates, and flag changes that may affect cost or delivery.

  • One point of contact for project questions
  • Approval points agreed before the work they affect
  • Production updates with photos and next steps
Discuss Your Manufacturing Project

Know Who Coordinates Your Project

Your STARWAY MFG GROUP sales contact is your point of contact for order questions, approvals and updates. Behind that contact, the teams review your order from different angles.

STARWAY staff discussing project requirements at a meeting

Sales

Confirms commercial details, shares customer requirements internally and follows up on open decisions.

STARWAY team members outside a manufacturing facility

Engineering

Reviews drawings, tolerances and manufacturing requirements, and prepares the workshop drawings.

Operator setting up a machine for a production operation

Production

Reviews feasibility, sequence and lead time, then plans the work.

Staff member measuring a formed metal component

Quality

Reviews inspection, acceptance and packing requirements for the order.

Staff reviewing order information on a display

Production Material Control (PMC)

Tracks active orders and coordinates issues across teams.

Agree the Milestones and Approval Points

We agree which decisions are needed before work proceeds. A repeat order may only need a revision check; a new part may need sample approval before the production batch starts.

Swipe to view all three columns.

MilestoneCustomer Input or ApprovalOutput
RFQ and requirements reviewShare current drawings, quantities, finish and target date.Quote assumptions and open questions.
Order confirmation and production kickoffConfirm the order scope and drawing revision; answer any open questions.Work instructions and planned production milestones.
Sample review, if applicableApprove the sample or agree what needs to change.Recorded approval or agreed action before the next run.
Production and inspectionConfirm any changes that affect agreed requirements.Status updates and inspection records as agreed.
Packing and shipmentConfirm any packing, labeling or delivery instructions.Packing list and shipment details as agreed.

Keep Drawing Revisions and Order Changes Controlled

If a drawing changes after quotation or after production starts, send the new revision and tell us which features or requirements changed. Include the part number, revised drawing and, if available, a marked-up comparison.

Our team checks where the earlier revision is already in use, including purchased material, work in progress and finished parts where relevant. We review whether the change affects price, timing, inspection or parts already made. Once the required decisions are confirmed, the team updates the documents used for the affected work.

Design Engineering
Manufacturing review note comparing bent-edge behavior and proposed relief-notch options
Manufacturing review reference

What a Production Update Covers

For active production orders, your STARWAY contact shares a weekly update with progress photos, any decisions we need from you, and the next milestone. If we need a decision sooner, we’ll contact you separately.

  1. Completed

    What’s already done

    Blue metal frame assembled with fasteners on protective foam
  2. Awaiting Your Confirmation

    What needs your input, if anything

    Close-up of corner joints and fasteners in a blue sheet-metal frame
  3. Next Milestone

    What’s planned next

    Formed square feature in a blue sheet-metal panel with masking tape nearby

Production Update from a Past Order

  • Engineering drawings were released to STARWAY Jingdezhen on August 25, 2026.
  • Customer confirmation of the drawings and revised 3D model was still pending as of August 19, 2026.
  • Issue the packing instructions. The order was planned for wooden crate packing and ocean freight.

Resolve Issues Before the Next Handover

When an issue could affect fit, appearance or the schedule, PMC brings the teams responsible for the next step together to assess it and agree what happens next.

  1. Record the issue

    Identify the affected part, batch or operation and document what was found.

  2. Check the impact

    Establish what can proceed and what needs review before moving forward.

  3. Agree the response

    Coordinate the next action with engineering, production and quality. Ask for customer approval when the proposed change affects an agreed requirement.

  4. Verify before handover

    Check the affected requirement again and record the result before releasing the affected work.

Quality

How ERP and MES Support Project Visibility

ERP and MES give the teams coordinating your order two views of the same project: what was agreed and what is happening in production.

ERP: Order and Requirements

The team records order details, drawings, quality requirements and planned dates for internal reference.

MES: Production Status

The team monitors progress and process status while parts are on the shop floor.

What You Receive
Your sales contact shares the relevant production status, photos, open decisions and agreed milestones.

These are internal coordination records. Your sales contact provides the customer updates relevant to your order.

Internal production dashboard with charts and order status records
Internal project coordination reference

A Multi-Process Project Example

Illustrative Example: Sheet Metal Enclosure and Machined Mounts

Reference images illustrate the workflow described below.

Sheet-metal panels hanging on a finishing rack
Reference photo

Project requirements

A formed enclosure and a set of machined mounting blocks need to fit together after finishing. The drawing identifies the mounting locations and faces that must remain free of coating.

Formed sheet-metal housings arranged in rows
Reference photo

Coordination

Engineering checks the mating features together before release. When the parts reach finishing, the team confirms masking requirements so they are carried forward to the finishing instructions.

Digital caliper checking a metal component against an engineering drawing
Reference photo

Handover

The inspection plan calls for a fit check after finishing. The packing plan keeps the enclosure and its matched mounting hardware together for assembly at the destination.

Customer Visit And Testimonials
Learn more

Project Management FAQ

Share Your Project Requirements

Tell us what you are making, where the project stands and which dates or approvals matter. If you have drawings or a part list, attach the current revision so we can review the scope and follow up on open questions.

Include part quantities, required approvals or the main schedule constraint.

Agree any NDA or specific file-handling requirements before sharing sensitive files.

Metal bracket beside an engineering drawing and a project milestone checklist.
Drawings or BOM (optional)Up to 5 files, each smaller than 49.75 MB. PDF, CAD, ZIP, XLS, XLSX, CSV, PNG, JPG, JPEG or WebP.

Agree any NDA or specific file-handling requirements before sharing sensitive files.

This website uses cookies to provide you with a personalized browsing experience and analyze website traffic. By clicking "Accept", you agree to our use of cookies.